This isnt how it works? When I run an ad and the scheduler is set, it takes that in to account. So, when I have it set to say, 2.5 minutes every half hour, for 5 minutes an hour, and I run a 3 minute ad at any point, it counts that extra 30 seconds towards the next schedule break, or skips it if it exceeds it.
so if I am sceduled to run 2.5 minutes in a half hour, and an ad is scheduled to run in the last 3 minutes of every half hour (XX:27 or XX:57), and an ad just played and a new half hour starts, I can run a 3 minute ad at say, 3:45, and then that will take care of the break at 3:57, and make the break at 4:27 be 2 minutes instead of 2.5.
this was my understanding with how it works, and I understood the revenue was still 55% as long as it was still at least 3 mins per hour
This isnt how it works? When I run an ad and the scheduler is set, it takes that in to account. So, when I have it set to say, 2.5 minutes every half hour, for 5 minutes an hour, and I run a 3 minute ad at any point, it counts that extra 30 seconds towards the next schedule break, or skips it if it exceeds it.
so if I am sceduled to run 2.5 minutes in a half hour, and an ad is scheduled to run in the last 3 minutes of every half hour (XX:27 or XX:57), and an ad just played and a new half hour starts, I can run a 3 minute ad at say, 3:45, and then that will take care of the break at 3:57, and make the break at 4:27 be 2 minutes instead of 2.5.
this was my understanding with how it works, and I understood the revenue was still 55% as long as it was still at least 3 mins per hour